bet3365备用网址-bet3365娱乐场开户

Welcome to JIANGSU VNKE ROAD MACHINERY TECHNOLOGY CO., LTD.
Service Hotline:
13906175842    0510-85264858
Problem

POSITION:HOME > Problem

Maintenance of Control System of Hot Recycled Asphalt Mixing Plant

As a core part of the whole heat-regenerated asphalt mixing plant, the control system should not be overlooked in its routine maintenance. Good maintenance will also help to control the effectiveness of the system, thereby promoting the use of asphalt mixing plant.
As with other equipment, the asphalt mixing plant control system must also be maintained daily. The main content of maintenance is draining condensate and checking the management and maintenance of the lubricating oil and air compressor systems. Since condensate drainage involves the entire pneumatic system, it is important to prevent water droplets from entering the control element. When the pneumatic device is running, you should check whether the oil drip amount of the oil mist eliminator meets the requirements and whether the oil color is normal. Do not mix dust, water and other impurities into it. Air compressor system is nothing more than the daily management of sound, temperature and lubricants, to ensure that these can not exceed the required standard.
Related Content

Copy right ? 2018   JIANGSU VNKE ROAD MACHINERY TECHNOLOGY CO., LTD.   All Rights Reserved